Skip to main content

ProWise Construction

Resources · ProWise Construction

Construction Resources for Ontario Owners, Developers, and Facility Teams

Use this hub to move from early budget planning to delivery-model decisions, engineering review, and project-fit conversations. Start with the calculator if you are still at feasibility stage; use the contract and engineering resources when scope, risk, or permitting questions start to shape procurement.

Use the Cost Estimator Request a Project Review

Budget Planning

Construction Cost Calculator

Use the calculator to generate a Class D conceptual cost range for Ontario industrial and commercial projects. It is most useful for feasibility checks, early budget conversations, and deciding whether a project needs deeper contractor or consultant review.

Open the Cost Calculator

Decision Guides

Budget Planning, Estimate Methodology and Contract Models

Before comparing bids or choosing a delivery path, make sure the estimate class, assumptions, and contract structure are clear. These resources explain how a construction budget is layered, how early construction ranges work and how fixed-price, cost-plus, and construction management models shift cost visibility and risk.

Start with Budget Planning

Read How Estimates Work

Compare Contract Models

Engineering Consultant Resource: ProWise Engineering

Some construction questions should be reviewed by an engineering consultant before a budget or schedule is treated as reliable. Structural changes, MEP tie-ins, OBC Part 3 triggers, PSHSR requirements, equipment installations, and sealed permit documentation can all affect construction scope. ProWise Engineering handles those professional engineering and consulting questions on prowise.ca, with coordinated handover when the project also moves into construction.

Visit ProWise Engineering

Cost Guides

Building-Type Construction Cost Guides for Ontario

Ten guides, each giving a Class D cost range (±20–30%, Q4 2025 benchmarks) for one building type, with the scope assumptions, regional variation, soft-cost overlays, and regulatory triggers that move the number. Read the guide for your project type, then run the calculator with your own inputs.

Warehouse Construction Cost – Ontario

New-build warehouse and distribution space, GTA core vs. secondary Ontario markets, with clear-height and site-servicing adjustments.

Read the warehouse guide

Cold Storage Construction Cost – Ontario

Refrigerated and freezer warehouse construction, including envelope, refrigeration plant, and floor-slab premiums over dry storage.

Read the cold storage guide

Office Tenant Improvement Cost – GTA

Office fit-out and tenant improvement ranges by finish level, with landlord-work, base-building, and MEP reuse assumptions.

Read the office TI guide

QSR / Restaurant Construction Cost – GTA

Quick-service and full-service restaurant build-outs, including kitchen exhaust, grease interceptor, and franchise-standard premiums.

Read the restaurant guide

Long-Term Care Building Cost – Ontario

New long-term care and seniors' care buildings, with Ministry design-standard, resident-home-area, and MEP-intensity drivers.

Read the long-term care guide

All Cost Guides

All ten guides in one place: warehouse, manufacturing plant, industrial retrofit, cold storage, self-storage, office TI, medical office, restaurant, daycare, and long-term care.

Browse all cost guides

Send us the project context and where you are in the planning process.

Tell us the project type, location, target timeline, and current scope notes. We will respond within one business day with the next resource, question, or service path that fits.

Request a Project Review